| |
Project: Bayswater Coal Fast Train Loading Chute & Control Room Hunter Valley, NSW, Australia
Owner: Bayswater Coal
Client: Barclay Mowlem
Project Value: AUD$1.5M
The Bayswater Coal Operation in the Upper Hunter Valley area of NSW was upgraded to include a fast train loading facility. As part of this facility a new loading chute and control room were provided. This loading facility was subsequently developed to become the loading facility for coal from the new Mount Arthur North Coal Mine.
KLJ Consulting provided engineering management for the supply, manufacture, installation and commissioning of the train loading chute and the control room, including the PLC hardware and software control system for the facility.
|
|
|
|